article thumbnail

CERN’s Large Hadron Collider gears up for Run 3

Physics World

This third run of the LHC, called Run 3, will last until 2025 and will see the machine’s experiments collect data from collisions not only at a record energy but also in unparalleled numbers. Commissioning of HL-LHC is due to start in 2029. . This is how CERN’s Large Hadron Collider looks during the 2019 shutdown.

2029 125
article thumbnail

IMO Fails Duty to Protect Climate and the Arctic

Ocean Conservancy

As you may remember, we weren’t overjoyed at the results last session , which settled on a profoundly underwhelming short term measure to address the sector’s greenhouse gas (GHG) emissions in addition to a diluted “ban” on heavy fuel oil (HFO) use in the Arctic that will only take effect in 2029. C warming scenario.

Ocean 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Astro2020 Decadal Survey calls for ‘great observatory’ to succeed Hubble

Physics World

Co-chaired by Fiona Harrison from the California Institute of Technology and Robert Kennicutt from the University of Arizona and Texas A&M University, it is the seventh decadal survey of its type. The $1bn GMT will be located at Las Campanas in Chile’s Atacama Desert and is on-track for first light in 2029.

article thumbnail

Commission Issues Long-Awaited Proposed Decision in Transportation Electrification (TE) Proceeding, Setting a Framework for California TE Policy and Investment

Renewable + Law

Staff Proposal: the TEF The Staff Proposal recommended that FC1 begin in 2025 to allow for exhaustion of currently approved TE funding. As proposed, Funding Cycle 2 (FC2) would start in 2030, after FC1 completes at the end of 2029, and would be based on an assessment of FC1 and further analysis of the policy and market needs at that time.

article thumbnail

Commission Issues Long-Awaited Proposed Decision in Transportation Electrification (TE) Proceeding, Setting a Framework for California TE Policy and Investment

Renewable + Law

The Staff Proposal recommended that FC1 begin in 2025 to allow for exhaustion of currently approved TE funding. As proposed, Funding Cycle 2 (FC2) would start in 2030, after FC1 completes at the end of 2029, and would be based on an assessment of FC1 and further analysis of the policy and market needs at that time.