Pipeline Decisions Do Not Spell Doom for Transmission
Law Columbia
SEPTEMBER 15, 2020
However, because these stumbling blocks arose out of water quality issues that are specific to fossil fuel pipelines, they are unlikely to affect electricity transmission. The Corps issued NWP 12 in 1977, and most recently reissued NWP 12 in 2017. The ruling raised a number of questions, including about the fate of power lines.
Let's personalize your content